Our footprint




Securing an industry-leading project completion rate, serving diverse markets with complex energy needs.
Innovative energy solutions

Our project portfolio
Country
All countries (20)
Bess del Desierto
BESS del Desierto is a stand-alone battery energy storage system currently under construction.

Draco
The Draco solar plant is currently under development and will service multiple clients.

Shangri-La
Shangri-La is currently under construction and holds a PPA with a major Colombian renewable energy player. The project is set to reach COD in 2025.
Luiz Carlos
Luiz Carlos is currently under development and holds a 15-year PPA with Votorantim Cimentos. The project is set to reach COD in 2025.
Vista Alegre
Vista Alegre is currently under construction and holds a 21-year PPA with ALBRAS. The project is set to reach COD in 2025.
La Pimienta
La Pimienta is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2022.

Guajiro
Guajiro is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2019.

Boa Sorte
Boa Sorte is currently operating and holds a 20-year PPA with ALBRAS. The project reached COD in 2024.

Lar Do Sol
Atlas Renewable Energy developed, built, and operated Lar do Sol from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Casablanca
Casablanca is currently operating and holds a 15-year PPA with Anglo American. The project reach COD in 2022.

Jacaranda
Jacaranda is currently operating and holds a 15-year PPA with Dow Inc. The project reached COD in 2021.

Sertão Solar
Atlas Renewable Energy developed, built, and operated Sertão Solar from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Sol Do Futuro
Atlas Renewable Energy developed, built, and operated Sol do Futuro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

São Pedro
Atlas Renewable Energy developed, built, and operated São Pedro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Eng. Manoel De Andrade
Atlas Renewable Energy developed, built, and operated Eng. Manoel de Andrade from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.

Del Litoral
Del Litoral is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.

El Naranjal
El Naranjal is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.

Sol Del Desierto
Sol del Desierto is currently operating and holds a 15-year PPA with Engie Energia Chile. The project reached COD in 2022.

Quilapilun
Quilapilun is currently operating and holds a 15-year PPA. The project reached COD in 2017.

Javiera
Javiera is currently operating and holds a 20-year PPA with Minera Los Pelambres (Antofagasta Minerals). The project reached COD in 2015.