![Atlas logo](/_next/image?url=%2Fatlas-menu-logo.png&w=256&q=75)
![Atlas logo](/_next/image?url=%2Fatlas-menu-logo-black.png&w=256&q=75)
We are committed to
delivering best-in-class
clean energy projects.
Our footprint
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FScreen-Shot-2022-12-15-at-18.51-1-1.jpg&w=3840&q=75)
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FScreen-Shot-2023-01-13-at-19.30-1.jpg&w=3840&q=75)
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FScreen-Shot-2022-10-17-at-18.13-4-2.jpg&w=3840&q=75)
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FScreen-Shot-2022-12-14-at-11.47-1-3.jpg&w=3840&q=75)
Securing an industry-leading project completion rate, serving diverse markets with complex energy needs.
Innovative energy solutions
![](/_next/image?url=%2FofficeIcon.png&w=64&q=75)
Our project portfolio
Country
All countries (20)
Bess del Desierto
BESS del Desierto is a stand-alone battery energy storage system currently under construction.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FAtlas-Renewable-Energy-1030x574-2.png&w=1080&q=75)
Draco
The Draco solar plant is currently under development and will service multiple clients.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FAtlas-Renewable-Energy-1030x574-1.png&w=1080&q=75)
Shangri-La
Shangri-La is currently under construction and holds a PPA with a major Colombian renewable energy player. The project is set to reach COD in 2025.
Luiz Carlos
Luiz Carlos is currently under development and holds a 15-year PPA with Votorantim Cimentos. The project is set to reach COD in 2025.
Vista Alegre
Vista Alegre is currently under construction and holds a 21-year PPA with ALBRAS. The project is set to reach COD in 2025.
La Pimienta
La Pimienta is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2022.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FAtlas-Renewable-Energy_La-Pimienta_8-1030x686-1.jpg&w=1080&q=75)
Guajiro
Guajiro is currently operating and holds a 15-year PPA with CFE Suministro Basico. The project reached COD in 2019.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsolar-plant-guajiro-hidalgo-mexico-01-1030x579-1.jpg&w=1080&q=75)
Boa Sorte
Boa Sorte is currently operating and holds a 20-year PPA with ALBRAS. The project reached COD in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FAtlas-Renewable-Energy-Boa-Sorte-1.jpeg&w=1080&q=75)
Lar Do Sol
Atlas Renewable Energy developed, built, and operated Lar do Sol from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FLar-do-Sol_Janz072023-1-1-scaled.jpg&w=1080&q=75)
Casablanca
Casablanca is currently operating and holds a 15-year PPA with Anglo American. The project reach COD in 2022.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FDJI_0125-RT-scaled.jpg&w=1080&q=75)
Jacaranda
Jacaranda is currently operating and holds a 15-year PPA with Dow Inc. The project reached COD in 2021.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FJacaranda_Atlas-Renewable-Energy-11-1030x580-1.jpg&w=1080&q=75)
Sertão Solar
Atlas Renewable Energy developed, built, and operated Sertão Solar from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsertao-solar-solar-plant-01-1030x579-1.jpg&w=1080&q=75)
Sol Do Futuro
Atlas Renewable Energy developed, built, and operated Sol do Futuro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsol-do-futuro-solar-plant-1-1030x771-1.jpg&w=1080&q=75)
São Pedro
Atlas Renewable Energy developed, built, and operated São Pedro from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fatlas-renewable-energy-sao-pedro-solar-plant-bahia-brazil-01-1030x646-1.jpg&w=1080&q=75)
Eng. Manoel De Andrade
Atlas Renewable Energy developed, built, and operated Eng. Manoel de Andrade from 2017-2024. Currently, the plant is owned and managed by Engie Brasil Energias Complementares Participaçõpes after a successful sale in 2024.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fatlas-renewable-energy-juazeiro-solar-plant-bahia-brazil-01-1030x771-1.jpg&w=1080&q=75)
Del Litoral
Del Litoral is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsolar-plant-del-litoral-salto-uruguay-07-1030x584-1.jpg&w=1080&q=75)
El Naranjal
El Naranjal is currently operating and holds a 30-year PPA with UTE. The project reached COD in 2017.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsolar-plant-del-naranjal-salto-uruguay-05-1030x579-1.jpg&w=1080&q=75)
Sol Del Desierto
Sol del Desierto is currently operating and holds a 15-year PPA with Engie Energia Chile. The project reached COD in 2022.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2FSol-del-Desierto_Atlas-Renewable-Energy_2-1.jpg&w=1080&q=75)
Quilapilun
Quilapilun is currently operating and holds a 15-year PPA. The project reached COD in 2017.
![](/_next/image?url=https%3A%2F%2Flive.atlasrenewableenergy.com%2Fassets%2Fmedia%2Fsolar-plant-quilapilun-colina-chile-01-1030x687-1.jpg&w=1080&q=75)
Javiera
Javiera is currently operating and holds a 20-year PPA with Minera Los Pelambres (Antofagasta Minerals). The project reached COD in 2015.